|
Client: City of Bellingham
Project Description: : Joanne Greenberg and Karen F. Welch are conducting a yield analysis of the City of Bellingham’s water supply system. The City’s water supply has several components; water diverted from the Middle Fork Nooksack River is conveyed through a tunnel, pipeline, small lake and eventually delivered to Lake Whatcom. Tasks include generating a daily diversion record, reconstructing daily flow values and reconstructing gate releases from Lake Whatcom.
Client: Public Utility District No. 1 of Whatcom County
Project Description: Joanne Greenberg and Karen F. Welch conducted a feasibility study of a potential reservoir for the PUD#1 of Whatcom County. This project required the development of a computer model, using the STELLA II platform, to simulate reservoir operations at a proposed site. Determined the size of reservoir required to meet a future demand of 10 MGD while meeting the current instream flow requirement in the Nooksack River.
Client: Seattle Water Department
Project Description: Joanne Greenberg managed the operations of the Water Resources Management Model (WRMM) for the planning activities of the Seattle Water Department. She developed and updated natural flows and conducted yield analyses, through computer modeling, for the North and South Fork Tolt River and the Cedar River for purposes of municipal water supply planning. In addition, she provided technical support for the Instream Flow Study on the Cedar River.
|